Plumbing Work & Utility Piping

Commercial utility networks: water supply, storm drainage, pressurized pump skids, and SBC 701 compliance.

Plumbing Work & Piping Systems

At Perfect Gulf Limited, we provide comprehensive plumbing installation and maintenance services for residential, commercial, and industrial projects. Our skilled team of certified plumbers ensures that every installation meets local and international plumbing codes, guaranteeing safety, hygiene, and long-term durability.

Water Supply System Installation

  • Cold and hot water distribution piping
  • Water tanks (overhead/underground)
  • Pumps and pressure systems

Drainage and Sewerage System

  • Underground and above-ground drainage piping
  • Inspection chambers and manholes
  • Rainwater drainage system
  • Vent piping

Sanitary Fixtures and Fittings

  • Installation of water closets, wash basins, urinals, bathtubs, kitchen sinks, and other sanitary ware
  • High-end, energy-efficient plumbing fittings

Plumbing for Specialized Areas

  • Water heaters (electric/solar/central)
  • Grease traps and interceptors for commercial kitchens
  • Backflow prevention systems

Testing and Commissioning

  • Hydrostatic and pneumatic pressure testing
  • Drainage and leak test
  • System flushing and disinfection

Technical Specifications & SBC Compliance

Every pipe joint, pressure valve, and drain slope adheres to international standards and KSA sanitary rules.

Compliance Standard Application Scope PGL Verification Checklist
SBC 701 Saudi National Plumbing Code Piping pressure tests, pipe support intervals, air vents, backflow preventers.
IPC Standards International Plumbing Code Drain slopes (typically 1/4 inch per foot), grease traps layout, plumbing fixtures counts.
ASTM Standards Materials Testing & Standards Checking PVC/PPR pipe ratings, testing joints under operating pressures.

Service-Specific FAQs

What types of piping materials do you use for commercial installations?
For clean water supply lines, we use fusion-welded Polypropylene Random Copolymer (PPR) or copper pipes, which resist chemical corrosion and high temperatures. For sanitary drainage and waste lines, we use heavy-duty schedule-40 PVC or High-Density Polyethylene (HDPE) joined by butt-fusion.
Do you design storm drainage and rainwater runoff systems?
Yes. Our design division performs local peak rainfall runoff calculations based on roof surface area. We size and install high-capacity storm gutters, vertical downspouts, and underground sand-traps to channel rainwater away safely.
What leak testing do you perform before backfilling or dry-walling?
All supply lines undergo hydrostatic pressure testing at 150 PSI for a minimum of 2 hours, checked with calibrated gauges. All gravity drainage lines are tested by filling the stack with water (head test) to check every joint for leaks before walls are closed.